01 / REVIEW

Use separate fields

Record stated harvest country, processing country and shipping country independently. A seller’s address belongs to the supplier record. None of these fields should silently populate another.

02 / REVIEW

Attach the statement

For each location, record the issuer and document reference. A location claim needs a relationship to the lot or shipment under review. If the statement covers a wider supply program, record that limitation.

03 / REVIEW

Ask the unresolved question

When a required harvest statement is missing, request it directly. Consult the applicable current official requirements with the importer or qualified adviser; this workspace is not an import declaration service.

Do not turn a business address into a forest origin

A shipment can pass through several places. Harvest, processing, storage, export and sale can occur in different locations. Record which event each location describes. The address on an invoice identifies a party to the transaction; it does not necessarily identify where the tree grew.

Ask the issuer to state the scope of an origin claim and the material it covers. Keep the original level of detail. If the evidence supports only a country, do not add a region or forest name to make the record look complete.

Separate locations in the record

Separate locations in the record
Location typeQuestion to answer
HarvestWhere does the supporting source say the wood originated?
ProcessingWhere was the recorded transformation performed?
StorageWhere was the lot held at the recorded time?
Export or shipmentWhich movement does this location describe?
SellerWhich business issued the commercial document?

In a fictional transaction, the seller is in Country A, the processing record names Country B and the origin statement names Country C. That pattern is not itself a contradiction. The review asks whether the documents connect the same material through those events.

A missing connection is still a gap even if every individual document appears plausible. Record the question narrowly: which document links the processed lot to the stated harvest source? That request is more useful than asking for another general company brochure.

A lot-record scenario

Fictional example: boards ship from a distributor in country A, are processed in country B and carry an unresolved harvest statement. The harvest field stays unknown until supported information is supplied.

Use the result

Keep the completed review with the relevant project record. Assign unresolved items before relying on a conclusion. If the material, condition or document changes, revisit the affected questions.

Evidence workspace
Technical references

General background for the subject. Project worksheets and fictional situations are original review aids, not official agency forms.

APHIS: Lacey declaration guidance

APHIS: Lacey declaration questions

APHIS: CITES plant trade guidance